Infrastructure
Infrastructure of Mathematics Science
- ADMINISTRATIVE AREA – H.O.D room – 370.00sqft
- (i) LABORATORY AREA(PHYSICS) – 1 no. of laboratories (1200.2 sqft)
(ii) LABORATORY AREA(CHEMISTRY) – 1 no. of laboratories (600 sqf) - ACADEMIC AREA – 4 no. of classrooms (2598.385 sqft)
Infrastructure of Mechanical Engineering
- ADMINSTRATIVE AREA(HOD ROOM): 527 sq ft.
- LABROTORY AREA: 03- 2766.4 sq ft.(Each 691.6)
3. ACADEMIC AREA – 06 nos – Total space 1604.75 sqft
Infrastructure of Civil Engineering
-
- ADMINISTRATIVE AREA- HOD ROOM-304 SQFT
- LABORATORY AREA- 03 -2680 SQFT
- ACADEMIC AREA- NO OF CLASS ROOMS-4 NOS(840+525+525+936=2826 SQFT)
Infrastructure of Electrical Engineering
- ADMINISTRATIVE AREA-H.O.D room- 290 sqft
- LABORATORY AREA- 3 no. of laboratories (1255.47 sqft)
- ACADEMIC AREA- 4 nos. of classrooms (3702.64sqft)
Infrastructure of Computer Science & Information Technology
- ADMINSTRATIVE AREA- H.O.D ROOM (250 sqft )
- LABORATORY AREA- NO.OF LABORATORIES- 01 (900 sqft)
- ACADEMIC AREA- NO. OF CLASSROOMS- 04 ( 820 sqft)
Infrastructure of Electronics and Telecommunication Engineering
- Administrative Area : H.O.D room = 150 sq. ft.
- LABORATORY AREA- 2 no. of laboratories (525.47 sqft)
- Academic Area- No. of class rooms = 3 : Area = 544 sq. ft.
Infrastructure of Applied Electronics & Instrumentation
-
- ADMINISTRATIVE AREA-H.O.D room- 150 sqft
- LABORATORY AREA- 2 no. of laboratories (907.47 sqft)
- ACADEMIC AREA- 4 no. of classrooms (3702.64sqft)
Infrastructure of Automobile
-
- ADMINISTRATIVE AREA-H.O.D room- 150 sqft
- LABORATORY AREA- 2 no. of laboratories (907.47 sqft)
- ACADEMIC AREA- 2 no. of classrooms (500.64sqft)
Academic Area:
No of Classroom | Total Sq. Ft. |
60 nos | 19200 Sq. Ft. |
Infrastructure of CDTP
- ADMINISTRATIV AREA – CDTP Training room
- LABORATORY AREA:
- Electronic lab
- Computer lab
- Automobile Lab
- ACADEMIC AREA
- Class room – 1 to 53 (For 1st, 2nd & 3rd Sem)
- Class room- New Block – M1 to Auto-2 ((For 1st, 2nd & 3rd Sem)
IT Facility
- 4 nos of Computer and IT labs with i3/i5/i7 Processor , Flat Screen , LAN with net connectivity
- 1 no of high speed lab with structured LAN and high speed net connectivity